Revision 46 as of 2011-05-19 16:31:20

Clear message
Locked History Actions

nebula-himac/RunSummary

Run Summary

@RIKEN

Run

Reaction

Target

Trigger

Start

Stop

Memo

10

(cosmic ray)

Tcal

5/8 11:31

5/8 11:34

Pedestal run

11

(cosmic ray)

5/8 ??:??

5/8 ??:??

JUNK

12

(cosmic ray)

NEBULA+HIME N+V self

5/8 12:12

5/8 12:26

same as run 0011

13

(cosmic ray)

NEBULA+HIME N+V self

5/8 12:30

5/8 12:42

HV changed

14

(cosmic ray)

NEBULA+HIME N+V self

5/8 12:48

5/8 13:00

HV changed

15

(cosmic ray)

NEBULA+HIME N+V self

5/8 13:03

5/8 13:16

HV changed

16

(cosmic ray)

NEBULA+HIME N+V self

5/8 13:20

5/8 13:32

HV changed

17

(cosmic ray)

NEBULA+HIME N+V self

5/8 13:40

5/8 13:57

HV changed

18

(cosmic ray)

5/8 15:30

5/8 15:35

JUNK

19

(cosmic ray)

NEBULA+HIME N+V self

5/8 15:57

5/8 ??:??

20

(cosmic ray)

HIME N+V self

5/8 17:21

5/8 17:24

Other's off

21

(cosmic ray)

HIME N+V self

5/8 17:34

5/8 17:54

Gain adjust for HIME(1,3), Other's off

22

(cosmic ray)

HIME N+V self

5/8 17:57

5/8 18:13

Gain adjust for HIME(1,3), Other's off

23

(cosmic ray)

HIME N+V self

5/8 18:15

5/8 18:32

same as run 0022

24

(cosmic ray)

HIME N+V self

5/8 18:34

5/8 18:48

same as run 0022

25

(cosmic ray)

HIME N+V self

5/8 18:57

5/8 19:15

same as run 0022

26

(cosmic ray)

NEBULA+HIME N+V self

5/8 20:57

5/8 21:11

GAIN check run

27

(cosmic ray)

NEBULA+HIME N+V self

5/8 22:37

5/? ??:??

GAIN check run

28

(cosmic ray)

5/9 7:34

5/9 8:52

JUNK

29

(cosmic ray)

NEBULA+HIME N+V self

5/9 8:59

5/9 10:04

HIME long run restart.

30

(cosmic ray)

NEBULA+HIME N+V self

5/9 10:05

5/9 11:02

same as previous setting.

31

(cosmic ray)

NEBULA+HIME N+V self

5/9 11:15

5/9 12:05

NEBULA NEUT 3R HV Changed -> 1500V

32

(cosmic ray)

NEBULA+HIME N+V self

5/9 12:05

5/9 12:56

same as previous setting.

33

(cosmic ray + 60Co)

NEBULA+HIME N+V self

5/9 13:14

5/9 13:30

VETO Gain tune. NEBULA VETO : 1600V, HIME VETO : 1300V

34

(cosmic ray + 60Co)

NEBULA+HIME N+V self

5/9 13:32

5/9 13:48

VETO Gain tune. NEBULA VETO : 1700V, HIME VETO : 1400V

35

(cosmic ray + 60Co)

NEBULA+HIME N+V self

5/9 13:50

5/9 14:08

VETO Gain tune. NEBULA VETO : 1800V, HIME VETO : 1500V

36

(cosmic ray + 60Co)

NEBULA+HIME N+V self

5/9 14:10

5/9 14:34

VETO Gain tune. NEBULA VETO : 1900V, HIME VETO : 1600V

37

(cosmic ray + 60Co)

NEBULA+HIME N+V self

5/9 14:25

5/9 14:45

VETO Gain tune. NEBULA VETO : 2000V, HIME VETO : 1700V. DAQ busy OFF until this run!!!

38

(cosmic ray + 60Co)

NEBULA+HIME N+V self

5/9 14:51

5/9 15:03

VETO Gain tune. NEBULA VETO : 2000V, HIME VETO : 1800V. DAQ busy ON !!!

39

(cosmic ray + 60Co)

NEBULA+HIME N+V self

5/9 15:06

5/9 15:32

VETO Gain tune. NEBULA VETO : 2000V, HIME VETO : 2000V

40

(cosmic ray + 60Co)

NEBULA+HIME N+V self

5/9 15:54

5/9 15:57

HIME VETO : 1700V. 60Co : HIME VETO center

41

(cosmic ray + 60Co)

NEBULA+HIME N+V self

5/9 15:58

5/9 16:03

60Co : HIME VETO

42

(cosmic ray + 60Co)

NEBULA+HIME N+V self

5/9 16:13

5/9 16:18

60Co : HIME VETO

43

(cosmic ray + 60Co)

NEBULA+HIME N+V self

5/9 16:19

5/9 16:24

60Co : HIME VETO

51

(cosmic ray)

HIME N+V self

5/11 16:05

5/11 17:59

only HIME N,V long run

@HIMAC

Run

Reaction

Target

Trigger

Start

Stop

Header

Ender

Memo

0052

15:40:05 17-May-11

09:00:00 01-Jan-70

test header

header test

0053

16:45:49 17-May-11

09:00:00 01-Jan-70

ipd test. no ped kill. ipd 0x21:245, 0x22:200

ped run end.

0054

17:02:12 17-May-11

09:00:00 01-Jan-70

Tcal run. NEBULA and HIME T.

Enough events.

0055

17:05:50 17-May-11

09:00:00 01-Jan-70

Tcal run. NEBULA and HIME T. Period=10 ns, range 640ns.

Enough events.

0056

17:10:04 17-May-11

09:00:00 01-Jan-70

Tcal run. SC, N VETO and H VETO. period = 10 ns. range 640ns.

Enough events.

0057

19:33:28 17-May-11

09:00:00 01-Jan-70

cosmic ray, check run, nebula end hime trg.

enough events

0058

20:40:44 17-May-11

09:00:00 01-Jan-70

cosmic ray, check run, nebula and hime trg, same as run0057

enough events.

0059

22:14:08 17-May-11

09:00:00 01-Jan-70

No beam . cosic ray. N & H trig.

Rate check end.

0060

00:06:45 18-May-11

09:00:00 01-Jan-70

cosmic ray, tame run, hime and nebula trg.

stop for next event, at next, change pedestal kill

0061

01:03:37 18-May-11

09:00:00 01-Jan-70

cosmic ray, pedestal kill new setting, H and N trg.

stop to daq ijiri

0062

01:50:30 18-May-11

09:00:00 01-Jan-70

test of DAQ for scaler

enough events

0063

02:47:30 18-May-11

03:36:21 18-May-11

nebula hv adjust run, nebula, n3R HV -100v, H and N trg

enough events

0064

04:09:10 18-May-11

03:36:21 18-May-11

tame run, cosmic ray, Hime and nebula trg

enough events

0065

04:30:33 18-May-11

10:01:22 18-May-11

cosmic ray run, long

stopped at 10:05

0066

18-May-11

18-May-11

scaler test run. nebula and hime coin check

NEBULA and HIME coin can be read

0067

16:05:35 18-May-11

16:29:55 18-May-11

cosmic ray, nebula veto_2R 2000V->1900V self

ok

0068

16:33:14 18-May-11

18:57:36 18-May-11

cosmic ray, self trg. N3R 1600V->1416V N3L 1526.5V->1626.5V

stop for pedestal check

0069

19:57:00 18-May-11

21:43:32 18-May-11

veto debug runcosmic ray, V1L 1800V->1900V V2L 1800V->1900V V1R 1800V->1900V V2R 1900V->2000V like that, self trg

enough events

0070

22:04:06 18-May-11

22:08:27 18-May-11

beam dump run. Hime HV changed. H1L ->1261V H1R ->1322V H2L ->1497V H2R ->1464V H3L ->1012V H3R ->1109V (1,2->1/3 , 3->1/2)

good

0071

22:26:53 18-May-11

22:42:19 18-May-11

HIME gain check run, cosmic ray, self trg

enough events

0072

22:52:17 18-May-11

22:52:37 18-May-11

pedestal run. tcal trg

owari

0073

00:44:11 19-May-11

00:51:59 19-May-11

proton beam, beam+NEUT×beam trg. hime zero degree run

stopped by buster of start counter was off

0074

01:00:19 19-May-11

01:03:41 19-May-11

same as 0073 except for booster HV

enough events

0075

01:17:34 19-May-11

01:25:28 19-May-11

proton beam. beam+NEUT×beam trg. nebula zero degree run.

enough events

0076

Li

01:38:07 19-May-11

01:51:58 19-May-11

proton beam, beam+NEUT×beam trg. Li target in. nebula check run

Li target in(~2cm2 , 1g/cm2)enough events. nebula zero degree mesurement. finished

0077

Li

02:26:57 19-May-11

03:13:58 19-May-11

proton beam. Li target, trg DSB(1/5000)+B×N HIME neutron run

once stop

0078

Li

03:24:59 19-May-11

04:00:29 19-May-11

proton beam. Li target, trg DSB(1/5000)+B×N HIME neutron run

stop for exchange to empty target

0079

04:27:47 19-May-11

04:56:41 19-May-11

proton beam. nearly empty target, trg DSB(1/5000)+B×N HIME neutron run

stop for pedestal kill check

0080

05:02:09 19-May-11

05:09:45 19-May-11

proton beam. nearly empty target, trg DSB(1/5000)+B×N pedestal kill reset

we want to install Li target

data seems to be good

0081

Li

05:22:52 19-May-11

05:57:28 19-May-11

proton beam, Li installed, trg DSB(1/5000)×N

stop for DAQ problem???

data problem in a part of data

0082

06:01:19 19-May-11

06:39:39 19-May-11

run all .sh. proton beam. nearly empty tgt, trg DSB(1/5000)+N

stop for empty run

0083

06:48:48 19-May-11

06:59:34 19-May-11

run all .sh. proton beam. Empty target, trg B*DSB(1/5000)+B×N

end of time

0084

16:06:48 19-May-11

06:59:34 19-May-11

cosmic ray run.N+V trg

end of cosmic ray run

0085

18:03:48 19-May-11

06:59:34 19-May-11

pedestal run after change cabling.

Enough events.

0086

18:09:27 19-May-11

06:59:34 19-May-11

cosmic ray. event build check. N+H self trg

for killing pedestal

0087

18:55:48 19-May-11

06:59:34 19-May-11

cosmic ray run after pedestal kill. N+V single trg

about 1 hour, stop

0088

19:47:40 19-May-11

06:59:34 19-May-11

continue cosmic-ray run before 40Ar beam

can't see HV AR raw

0089

20:12:38 19-May-11

06:59:34 19-May-11

pedestal on, check hime veto a signal cosmic ray

hime veto problem was due to software bug (read of map file)

0090

20:45:37 19-May-11

06:59:34 19-May-11

cosmic ray run after pedestal killing

end of cosmic run with or without beam

0091

Carbon

22:58:43 19-May-11

06:59:34 19-May-11

40Ar beam 5000ppp, trg=DSB(1/1)+B×N, check start counter by DAQ

HV of START is little bit high, change

0092

Carbon

23:08:59 19-May-11

06:59:34 19-May-11

start HV L->1150, R->1100

end of run

0093

Carbon

00:01:25 20-May-11

06:59:34 19-May-11

beam rate is about 40kcps

change DAQ setting, stop

0094

Carbon

00:16:49 20-May-11

06:59:34 19-May-11

DAQ setting is changed restart

HIME VETO can be seen in DATA, strange

0095

Carbon

00:50:26 20-May-11

06:59:34 19-May-11

trigger=B×N×(HIME VETO)+DSB(1/1000), check the effect of HIME VETO

end of run95

0096

Carbon

01:20:06 20-May-11

06:59:34 19-May-11

trigger returned, trig=N×B×Vbar+DSB(1/1000), restart pi0 run